Clear stages, identified deliverables at each one, and a usable product well before the end. At any point you know what has been done and what remains.

First usable batch
6 to 12 weeks

Overview

The whole path at a glance

From business need to a system in operationSix-stage delivery chain, from understanding operations to evolving the delivered system.Business needWhat is blocking today01Understand1 to 2 weeksA map of the processes co…02Frame1 to 2 weeksScope of batch 1 and what…03Design2 to 4 weeksA clickable prototype04BuildTwo-week iterationsAn acceptance environment…05Deploy1 to 2 weeksVerified data migration06EvolveContinuousMonitoring and alertsSystem in operationUsed, documented, maintained
  1. Understand (1 to 2 weeks) — A map of the processes concerned, A list of pain points ranked by real cost, An inventory of existing systems and data
  2. Frame (1 to 2 weeks) — Scope of batch 1 and what is explicitly out of scope, Target technical architecture, Success criteria expressed in figures, Estimate and schedule
  3. Design (2 to 4 weeks) — A clickable prototype, A validated data model, Business rules written down
  4. Build (Two-week iterations) — An acceptance environment you can reach, Automated tests on the critical rules, Systematic code review
  5. Deploy (1 to 2 weeks) — Verified data migration, Training sessions by role, Switchover and rollback procedure, Operations documentation
  6. Evolve (Continuous) — Monitoring and alerts, Support commitments, A quarterly roadmap
Every stage produces identified deliverables. The first usable batch arrives before the end of the chain, not after it.

Stage by stage

Every stage, one by one

  1. 1 to 2 weeks

    Understand

    We start from your actual operations, not from a theoretical specification. Field interviews, process observation, an inventory of the tools already in place and of what genuinely gets in the way.

    Deliverables

    • A map of the processes concerned
    • A list of pain points ranked by real cost
    • An inventory of existing systems and data
  2. 1 to 2 weeks

    Frame

    We turn the findings into a scope: what the first batch covers, what it deliberately leaves out, and what it will cost. You stay free to continue or stop there.

    Deliverables

    • Scope of batch 1 and what is explicitly out of scope
    • Target technical architecture
    • Success criteria expressed in figures
    • Estimate and schedule
  3. 2 to 4 weeks

    Design

    Data model, screens, permissions, integrations. The database schema comes before the framework: it is the part that costs the most to correct afterwards.

    Deliverables

    • A clickable prototype
    • A validated data model
    • Business rules written down
  4. Two-week iterations

    Build

    Delivery in usable increments. You see and use the product throughout, rather than discovering it at the end.

    Deliverables

    • An acceptance environment you can reach
    • Automated tests on the critical rules
    • Systematic code review
  5. 1 to 2 weeks

    Deploy

    Data migration, role-based training, production start-up under supervision. The switchover is prepared and reversible.

    Deliverables

    • Verified data migration
    • Training sessions by role
    • Switchover and rollback procedure
    • Operations documentation
  6. Continuous

    Evolve

    Corrective maintenance, security updates, and new functionality prioritised with you as your needs change.

    Deliverables

    • Monitoring and alerts
    • Support commitments
    • A quarterly roadmap

What guides the method

The rules we do not negotiate

  • The need before the technology

    We spend time with the teams who do the work before proposing anything. A process that needed simplifying should not be automated.

  • Batches that stand alone

    Each batch delivers value independently of the next. You can stop after the first one having lost nothing.

  • The data model first

    A well-formed relational model outlives several changes of framework. It is also the part that costs most to fix afterwards.

  • Security from the design stage

    Role-based permissions, logging, server-side validation. Not an option added at the end, when it is too late to do it properly.